BUILDING PRELIMINARIES 1 | |||
---|---|---|---|
- Site selection / Location plan / Working drawings / Plot and | |||
site clearing / Site organization / Water supply | |||
SETTING OUT 7 | |||
- Interfering objects / Uneven ground / Sloping sites / Profiles | |||
FOUNDATIONS 15 | |||
- Types of foundations / Functions of the foundation / Dimensions | |||
for strip foundations | |||
NON-CONCRETE FOUNDATIONS 17 | |||
- Rubble and boulder foundations / Ashlar masonry foundations / | |||
Bonding principles / Laterite rock foundations / Artificial | |||
stone foundations | |||
CONCRETE FOUNDATIONS 29 | |||
- Excavating the foundation trenches / Measurements of stepped | |||
foundations / Levelling the trenches and marking the foundation | |||
depth / Mix proportions / Preparations before casting / | |||
Casting / Levelling the foundations / Curing | |||
FOOTINGS 43 | |||
- Functions of the footings / Materials and measurements | |||
SPECIAL BONDS 45 | |||
- Different wall thicknesses at a quoin / Different wall thicknesses | |||
at a T-junction / Different wall thicknesses at a cross junction | |||
HARDCORE FILLING 59 | |||
- Functions of the hardcore filling / Materials and arrangement / | |||
Compaction of the hardcore | |||
PLINTH COURSE 60 | |||
POSITIONS OF DOOR AND WINDOW FRAMES 61 | |||
DOOR FRAMES 63 | |||
- Types of door frames / Joints for door frames / Heads of | |||
door frames / Measurements for door frames / Concrete shoe / | |||
Installing door frames | |||
WINDOW FRAMES 77 | |||
- Types of window frames / Measurements of window frames / | |||
Steel cramps / Joints for window frames / Cills of window | |||
frames / Heads of window frames / Installing window frames | |||
WALLING UP BETWEEN FRAMES 87 | |||
MOSQUITO PROOFING 87 | |||
BURGLAR PROOFING 89 | |||
- Types of burglar of burglar proofing for windows | |||
DOORS 91 | |||
- Types of doors / Sizes of doors / Position of the door / | |||
Finishing treatment of the door / Ledged and battened doors / | |||
Ledged, braced and battened doors / Panelled doors / Flush | |||
doors / Large doors | |||
WINDOWS 109 | |||
- Types of casements / Battened casements / Panelled casements / | |||
Glazed casements / Flush casements / Joints / Louvre windows | |||
WORKING SCAFFOLDS 117 | |||
- Jack scaffold / Blocklayers scaffold / Ladder scaffold / | |||
Independent scaffold | |||
SUPPORTING SCAFFOLD 125 | |||
PROTECTIVE SCAFFOLDING 127 | |||
ARCHES 128 | |||
- Technical terms / Stability of arches / The segmental arch / | |||
Types of centring / Setting out the turning piece / Positions of | |||
the archstones / Setting up the centring / Skewback template / | |||
Laying the archblocks | |||
REINFORCED CONCRETE LINTELS 145 | |||
- Formwork / Reinforcement / Reinforcement systems / | |||
Corrosion in reinforced concrete | |||
WALLING ABOVE FRAMES 155 | |||
FORMWORK SYSTEM FOR RING BEAM 155 | |||
ROOFS IN GENERAL 157 | |||
- Roof types / Size of the roof / Roof pitch / Effective length | |||
of the sheets / Outline design / Loads | |||
LIGHT-WEIGHT STRUCTURES 165 | |||
- Basic shape of the roof construction / Technical terms | |||
LENGTHENING JOINTS FOR LIGHT-WEIGHT STRUCTURES 169 | |||
- Where to place a lengthening joint / Fish joints / Other | |||
lengthening joints | |||
CONSTRUCTION DETAILS 175 | |||
- Lean-to roof / Pent roofs / Gable roof / Designing built-up | |||
trusses / Joints for the truss / Marking out built-up trusses / | |||
Assembly of built-up trusses / Erecting a roof structure for | |||
a gable roof / Purlins / Fascia boards / Verandahs / Anchorage | |||
ROOF COVERING 201 | |||
- Alignment of the sheets / Sidelaps / Ridge caps / Helpful hints | |||
for roof covering | |||
HEAT PENETRATION - INSULATION 207 | |||
LIGHTENING 207 | |||
HIP ROOFS 209 | |||
- Setting out and constructing the half truss / Position and | |||
measurements of the hip truss / Constructing the hip truss / | |||
Erecting the hip of the roof / Covering a hip roof | |||
HIP AND VALLEY ROOF 219 | |||
- Position and measurements of the hip and valley roof / | |||
Construction of a hip and valley truss / Covering a hip and | |||
valley roof | |||
PLASTER AND RENDER 225 | |||
- Composition of plaster or render / Preparing the wall for | |||
plastering / Application techniques / Sequence of operations | |||
for plastering a straight wall / Positions of edge boards for | |||
plastering corners / Positions of edge boards for plastering | |||
around frames / Positions of edge boards for plastering the | |||
tops of gables / Positions of edge boards for plastering the | |||
top of a parapetted pent roof / Positions of the edge boards | |||
for plastering openings | |||
FLOOR CONSTRUCTION 241 | |||
- Sequence of operations for one-course work / Verandah floors | |||
STAIRS 249 | |||
- Requirements | |||
FORMWORK 251 | |||
- Formwork for coping / Formwork for pillars / Formwork for | |||
slabs / General hints for formwork | |||
REINFORCED CONCRETE SLABS 255 | |||
- Construction | |||
HANGING DOORS AND WINDOWS | |||
- Hanging a door with butt hinges | |||
LOCKS AND FITTINGS | |||
- Mortice lock / Rim lock | |||
CEILINGS | |||
- Construction, parts and sizes of plywood ceilings | |||
PAINTING | |||
- Preparation of surfaces for painting / How to paint / How to | |||
apply timber preservatives | |||
APPENDIX | |||
WATER PURIFICATION | |||
- Small water filter / Large water filter | |||
HAND-DUG WELLS | |||
- Lining wells / Tools and materials needed / Construction | |||
GRAIN STORAGE SILO | |||
- Construction of a silo / Using the silo / Circular masonry | |||
work / Sequence of operations | |||
PIT LATRINE | |||
- Capacity / Location / Design and construction of the squatting | |||
slab / Construction / Toilet room / Toilet partitions / | |||
Permanent latrine | |||
BUCKET LATRINE | |||
AQUA PRIVY SYSTEMS | |||
SOAKAWAYS | |||
MANHOLES | |||
SEPTIC TANKS |