Lessons from Aceh
Key considerations in post-disaster reconstruction
The Indian Ocean tsunami on 26 December 2004 devastated the coastline in Aceh province on the northern tip of Indonesia leaving 167,000 people dead and over half a million people without homes. This resulted in an unprecedented humanitarian response. Over the next three years the Disasters Emergency Committee (DEC) Member Agencies collectively constructed almost 20,000 houses in Aceh, in addition to numerous schools and health centres. In 'Lessons from Aceh' their experiences are used as a case study to illustrate the practical realities of delivering a successful programme and the range of issues that need to be considered; highlighting best and worst practice whilst recognizing that there is validity in different approaches within the same response. 'Lessons from Aceh' is targeted at senior managers, decision-makers and programme advisers to help them make informed decisions, manage expectations and reduce risk in future responses. It will also be of interest to built environment professionals, researchers or policy makers. An important theme throughout is the way in which reconstruction can act as a catalyst to recovery, contribute to long-term development and reduce vulnerability to future disasters. In Aceh, the most successful reconstruction programmes have left a legacy that is much more than just bricks and mortar.
Published: 2010
Pages: 96
eBook: 9781780440606
Paperback: 9781853397004
Prelims (Foreword, Acknowledgements) | |||
---|---|---|---|
Introduction | |||
Executive summary | |||
1. Planning | |||
2. Design | |||
3. Construction | |||
Back Matter (Resources, Glossary, References, Further reading) |
Jo da Silva
Jo da Silva is a Director at Arup where she leads the International Development team, and a Fellow of the Royal Academy of Engineering. She has 20 years experience in construction and has worked in post-disaster contexts since becoming a RedR member in 1991. Her key areas of expertise are sustainable development, shelter/housing, and disaster risk reduction, including climate change adaptation.
A conceptual framework for integrated management of disasters recovery projects
Bahmani, Homa
Zhang, Wei
Natural Hazards, Vol. 113 (2022), Iss. 2 P.859
https://doi.org/10.1007/s11069-022-05328-5 [Citations: 10]Eefit: the UK Earthquake Engineering Field Investigation Team
Booth, Edmund
Wilkinson, Sean
Spence, Robin
Free, Matthew
Rossetto, Tiziana
Proceedings of the Institution of Civil Engineers - Forensic Engineering, Vol. 164 (2011), Iss. 3 P.117
https://doi.org/10.1680/feng.2011.164.3.117 [Citations: 5]E-Planning and Collaboration
Post Disaster Housing Management for Sustainable Urban Development
Das, Kanu Kumar
Sharma, Nagendra Kumar
2018
https://doi.org/10.4018/978-1-5225-5646-6.ch078 [Citations: 0]The Concept of Risk Analysis of Actions Taken in the Reconstruction of Technical Infrastructure in the Areas After the Disaster on the Example of Syria
Nasan, Agha Weam
Szpytko, Janusz
Journal of KONBiN, Vol. 50 (2020), Iss. 1 P.1
https://doi.org/10.2478/jok-2020-0001 [Citations: 1]Process optimization for post disaster reconstruction project based on industrial design structure matrix (DSM)
Tang, Hui
Zhong, Qingping
Chen, Chuan
Soft Computing, Vol. 26 (2022), Iss. 17 P.8731
https://doi.org/10.1007/s00500-022-07196-4 [Citations: 1]Improving efficiency for post-disaster transitional housing in Indonesia
Yau, Nie-Jia
Tsai, Ming-Kuan
Nurma Yulita, Eryani
Disaster Prevention and Management, Vol. 23 (2014), Iss. 2 P.157
https://doi.org/10.1108/DPM-04-2013-0071 [Citations: 10]Long-term satisfaction of resettled communities: An assessment of physical performance of post-disaster housing
Wijegunarathna, E.E.
Wedawatta, G.
Prasanna, L.J.
Ingirige, B.
Procedia Engineering, Vol. 212 (2018), Iss. P.1147
https://doi.org/10.1016/j.proeng.2018.01.148 [Citations: 27]Build Back Better principles for post‐disaster structural improvements
Lamond, Jessica
Mannakkara, Sandeeka
Wilkinson, Suzanne
Structural Survey, Vol. 31 (2013), Iss. 4 P.314
https://doi.org/10.1108/SS-12-2012-0044 [Citations: 67]Developing a building-performance evaluation framework for post-disaster reconstruction: the case of hospital buildings in Aceh, Indonesia
Adamy, Aulina
Abu Bakar, Abu Hassan
International Journal of Construction Management, Vol. 21 (2021), Iss. 1 P.56
https://doi.org/10.1080/15623599.2018.1506903 [Citations: 9]Monitoring urban physical growth in tsunami-affected areas: a case study of Banda Aceh City, Indonesia
Amri, Ikhwan
Giyarsih, Sri Rum
GeoJournal, Vol. 87 (2022), Iss. 3 P.1929
https://doi.org/10.1007/s10708-020-10362-6 [Citations: 16]Advances in Engineering Management, Innovation, and Sustainability
Sustainability of Post-disaster Temporary Houses: A Review of Principles and Assessment Methods
Shamloo, Alireza
Wilkinson, Suzanne
Elkharboutly, Mohamed
Domingo, Niluka
2024
https://doi.org/10.1007/978-3-031-56544-1_51 [Citations: 0]Development of decision support tools for post-disaster infrastructure reconstruction and recovery: a scoping study
Greenal, Sherin
Anilkumar, Shyni
(2024) P.1
https://doi.org/10.1080/23789689.2024.2365502 [Citations: 0]Resilience in Pre-Columbian Caribbean House-Building: Dialogue Between Archaeology and Humanitarian Shelter
Samson, A. V. M.
Crawford, C. A.
Hoogland, M. L. P.
Hofman, C. L.
Human Ecology, Vol. 43 (2015), Iss. 2 P.323
https://doi.org/10.1007/s10745-015-9741-5 [Citations: 11]Post Disaster Housing Management for Sustainable Urban Development
Das, Kanu Kumar
Sharma, Nagendra Kumar
International Journal of Geotechnical Earthquake Engineering, Vol. 7 (2016), Iss. 1 P.1
https://doi.org/10.4018/IJGEE.2016010101 [Citations: 1]Governing Disasters
Indonesia’s Tsunami of 2004
2016
https://doi.org/10.1017/CBO9781316227008.005 [Citations: 0]Critical success factors for community‐based post‐disaster housing reconstruction projects in the pre‐construction stage in Indonesia
Ophiyandri, Taufika
Amaratunga, Dilanthi
Pathirage, Chaminda
Keraminiyage, Kaushal
International Journal of Disaster Resilience in the Built Environment, Vol. 4 (2013), Iss. 2 P.236
https://doi.org/10.1108/IJDRBE-03-2013-0005 [Citations: 62]Improving Role of Construction Industry for More Effective Post-Disaster Emergency Response To Road Infrastructure in Indonesia
Pribadi, Krishna S.
Puri, Eliza
Hanafi, Eliya
Hadinata, Tri
Roosmini, D.
Pribadi, K.
Sugeng, B.
Hadihardaja, I.K.
MATEC Web of Conferences, Vol. 147 (2018), Iss. P.06006
https://doi.org/10.1051/matecconf/201814706006 [Citations: 1]Housing recovery in the aftermath of a catastrophe: Material resources perspective
Diaz, Rafael
Kumar, Sameer
Behr, Joshua
Computers & Industrial Engineering, Vol. 81 (2015), Iss. P.130
https://doi.org/10.1016/j.cie.2014.12.036 [Citations: 18]AN ANALYSIS OF ISSUES FOR THE MANAGEMENT OF POST-DISASTER HOUSING RECONSTRUCTION
BILAU, Abdulquadri Ade
WITT, Emlyn
International Journal of Strategic Property Management, Vol. 20 (2016), Iss. 3 P.265
https://doi.org/10.3846/1648715X.2016.1189975 [Citations: 35]Achieving Postdisaster Reconstruction Success Based on Satisfactory Delivery of Client Values within Contractors’ Services
Aliakbarlou, Sadegh
Wilkinson, Suzanne
Costello, Seosamh B.
Jang, Hyounseung
Journal of Management in Engineering, Vol. 34 (2018), Iss. 2
https://doi.org/10.1061/(ASCE)ME.1943-5479.0000581 [Citations: 8]Integrating disaster risk reduction into post‐disaster reconstruction: A long‐term perspective of the 1931 earthquake in Napier, New Zealand
Hill, Mischa
Gaillard, JC
New Zealand Geographer, Vol. 69 (2013), Iss. 2 P.108
https://doi.org/10.1111/nzg.12014 [Citations: 10]Planning for relocation in recovery after the Great East Japan Earthquake
Barnes, Paul
Goonetilleke, Ashantha
Maly, Elizabeth
Ishikawa, Eiko
International Journal of Disaster Resilience in the Built Environment, Vol. 5 (2014), Iss. 3 P.243
https://doi.org/10.1108/IJDRBE-01-2014-0014 [Citations: 4]A matter of speed: The impact of material choice in post-disaster reconstruction
Celentano, Giulia
Escamilla, Edwin Zea
Göswein, Verena
Habert, Guillaume
International Journal of Disaster Risk Reduction, Vol. 34 (2019), Iss. P.34
https://doi.org/10.1016/j.ijdrr.2018.10.026 [Citations: 22]Key Criteria for Post-Reconstruction Hospital Building Performance
Adamy, Aulina
Abu Bakar, Abu Hassan
IOP Conference Series: Materials Science and Engineering, Vol. 469 (2019), Iss. P.012072
https://doi.org/10.1088/1757-899X/469/1/012072 [Citations: 4]What have we learned from 40 years’ experience of Disaster Shelter?
Davis, Ian
Environmental Hazards, Vol. 10 (2011), Iss. 3-4 P.193
https://doi.org/10.1080/17477891.2011.597499 [Citations: 36]Issues at the interface of disaster risk management and low-carbon development
Urban, Frauke
Mitchell, Tom
Villanueva, Paula Silva
Climate and Development, Vol. 3 (2011), Iss. 3 P.259
https://doi.org/10.1080/17565529.2011.598369 [Citations: 10]Provision of Post-flood Housing Reconstruction in Kuala Krai, Kelantan vs. Local Housing Practices
Hanafi, Nik Nurul Hana
Mohamad, Juliza
Anuar, Nor Hafizah
Chang, Wen-Shao
Environment-Behaviour Proceedings Journal, Vol. 8 (2023), Iss. 23 P.167
https://doi.org/10.21834/ebpj.v8i23.4492 [Citations: 0]Factors Influencing Housing Satisfaction in Post-Disaster Resettlement: A Case of Nepal
Shrestha, Barsha
Uprety, Sanjaya
Pokharel, Jiba Raj
Sustainability, Vol. 15 (2023), Iss. 17 P.12755
https://doi.org/10.3390/su151712755 [Citations: 1]Emergency and Disaster Management
Post Disaster Housing Management for Sustainable Urban Development
Das, Kanu Kumar
Sharma, Nagendra Kumar
2019
https://doi.org/10.4018/978-1-5225-6195-8.ch060 [Citations: 0]Resettlement Challenges for Displaced Populations and Refugees
Urbanism of Emergency: Use and Adaptation of Public Open Spaces in Disaster-Induced Resettlement Sites
Carrasco, Sandra
O’Brien, David
2019
https://doi.org/10.1007/978-3-319-92498-4_12 [Citations: 2]Analyzing the influence factors of the post-earthquake reconstruction project using fuzzy DEMATEL
Zhong, QingPing
Tang, Hui
Zhou, Wenmei
Journal of Asian Architecture and Building Engineering, Vol. 23 (2024), Iss. 3 P.1050
https://doi.org/10.1080/13467581.2023.2257265 [Citations: 1]Humanitarian Civil Engineering
Learning from humanitarian engineering projectsDELIVERING A NEW MATERNITY UNIT IN KACHUMBALA, UGANDAENVIRONMENTAL IMPACT MITIGATION: ADAPTING SHELTER AND SETTLEMENT SOLUTIONS IN BURUNDICHALLENGES AND SUCCESSES OF LOCAL PROJECTS: COMPARING THE TRADITIONAL DEVELOPMENT APPROACH WITH COMMUNITY-BASED DEVELOPMENT IN TANZANIAUNPACKING DENSITY IN SITES – OBSERVATIONS FROM THE SITE-PLANNING GBV PROJECT IN MAIDUGURI, NIGERIA
Flower, Ian
Flower, Dan
Vitale, Antonella
Kelly, Lewis
Paul, Daniel
Ashmore, Joseph
Kennedy, Jim
Piccioli, Alberto
Saoudi, Amina
2021
https://doi.org/10.1680/hce.64683.085 [Citations: 1]Disaster preparedness in a complex urban system: the case of Kathmandu Valley, Nepal
Carpenter, Samuel
Grünewald, François
Disasters, Vol. 40 (2016), Iss. 3 P.411
https://doi.org/10.1111/disa.12164 [Citations: 15]Integrated measures for managing permanent housing reconstruction
Ade Bilau, Abdulquadri
Witt, Emlyn
Malalgoda, Chamindi
Lill, Irene
Amaratunga, Dilanthi
Procedia Engineering, Vol. 212 (2018), Iss. P.403
https://doi.org/10.1016/j.proeng.2018.01.052 [Citations: 2]A REVIEW ON ISSUES ASSOCIATED WITH THE SHELTER RECONSTRUCTION AFTER GORKHA EARTHQUAKE 2015 IN NEPAL
Dhungana, Anoj
Dahal, Khet Raj
Shrestha, Subik
Thapa, Narbikram
Neupane, Sanchita
International Journal of Research -GRANTHAALAYAH, Vol. 5 (2020), Iss. 12 P.89
https://doi.org/10.29121/granthaalayah.v5.i12.2017.476 [Citations: 0]An Inquiry into Success Factors for Post-disaster Housing Reconstruction Projects: A Case of Kerala, South India
Anilkumar, Shyni
Banerji, Haimanti
International Journal of Disaster Risk Science, Vol. 12 (2021), Iss. 1 P.24
https://doi.org/10.1007/s13753-020-00309-3 [Citations: 19]Post-disaster reconstruction: A current analysis of Gujarat's response after the 2001 earthquake
Powell, Plato Jack
Environmental Hazards, Vol. 10 (2011), Iss. 3-4 P.279
https://doi.org/10.1080/17477891.2011.597839 [Citations: 13]